Installation, Commissioning & Testing

Full FAT/SAT commissioning lifecycle from preparation to handover.

OVERVIEW
DARTEC manages the full commissioning lifecycle for complex industrial, logistics and commercial systems. Our commissioning engineers bring deep technical expertise across mechanical, electrical, controls and automation disciplines — ensuring every system is tested, validated and handed over to specification. We follow structured commissioning methodologies aligned with international best practices, with full documentation at every stage.
SCOPE OF WORK
Commissioning planning and management
Factory Acceptance Testing (FAT)
Pre-commissioning and loop checks
Site Acceptance Testing (SAT)
Systems integration testing
Performance and load testing
Operational readiness assessment
Snag list management and close-out
Client training and knowledge transfer
As-built documentation and handover
OUR APPROACH
STEP 01
Planning
Detailed commissioning plan, test procedures, resource planning and schedule development. All stakeholders aligned before mobilization.
STEP 02
Factory Acceptance Test
FAT at vendor or manufacturer facility. Full functional testing of equipment and systems before shipment. Issues resolved before site delivery.
STEP 03
Site Commissioning
Pre-commissioning checks, loop testing, SAT execution and systems integration testing. Structured approach with daily reporting and issue tracking.
STEP 04
Handover
Operational readiness confirmation, client training, snag close-out and full documentation handover. We remain available for post-handover support.
CAPABILITIES
FATSATCommissioningTestingHandoverLoop ChecksPerformance Testing
RELEVANT INDUSTRIES
Logistics & E-commerce
Energy & Utilities
Data Centers
Healthcare